Project Case 0009: 22001A, 22002A Steam Boiler Project 22000 Series - Boiler Equipment

Created on:2023-02-26 14:31

This project is a 205T/h steam boiler project to supply Navoi Fertilizer Plant in Uzbekistan in 2019, including two sets of 90T/h and one set of 25T/h steam boiler. The 3 sets of boilers are all horizontal structure, and are respectively equipped with Olin GT-70A WD200 DN300 and GT-23A WD200 DN100 natural gas burners. The 90T boiler produces 1.6MPa G 300 ℃ superheated steam, and the 25T boiler produces 4.4MPa G 450 ℃ superheated steam. The project was put into operation in 2020 and has been in operation for about 3 years.

 